Showing posts with label bagwall. Show all posts
Showing posts with label bagwall. Show all posts

Friday, March 12, 2010

Loading the kiln















First pic shows the bag wall design. The bottom 2 rows of the bag wall are mortared in. I kept the vertical bricks & horizontals above loose for this firing, so I can adjust for the next firing if desired.

Half bricks were used under the bottom shelves, to give a 4.5" rise off the kiln floor.

Cone packs, that indicate how hot the kiln gets at a particular site in the kiln, were in front of each of the 6 peep holes, and an additional dozen were scattered around the kiln, including the floor and bagwall.

The next 3 photos are the back, middle & front stacks of shelves.
I had mis-judged just how much larger this kiln is than my last kiln.
A friend had brought over some pots a few days previous to add to this firing. I still ended up bringing some pots from the "archives" to be re-fired, in an effort to fire a full kiln.

One thing I didn't discover until I was stacking the front shelves was this: Since I had to turn the kiln shelves sideways to get them through the doorway, there was a limit as to how high I could put the top shelf in front. I will have to make sure I have at least a kiln shelf of taller pieces for every kiln load fired.